Customization: | Available |
---|---|
Type: | Technical Support |
Success Rate: | Over 98% |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
After the perforated interval is filled with the coating material, the wellbore can be cycled to meet the requirements of workover operations. The positive pressure coating can still prevent solid and liquid leakage to the pay zone.
well number |
|
artificial bottom(m) |
|
formation pressure MPa |
|
Pre-repair output 10km³ | Modified output 10km³ | |
252 | 3293~3298 | 3320 | 132 | 6.4 | 26.58 | 19.97 | 17 |
1, rigid support support for rigid solid particles, straight diameter is greater than the diameter distribution of the air layer pore throat.
2. Elastic seal The seal is elastic gel to eliminate the residual permeability between the rock and the support.
3. Under the action of positive pressure difference, the shielding agent is pressed on the rock surface, and the rigid particles remain and the elastic gel closes the permeability between the rock and the rigid particles.
Elastic modulus of particles with heat When the extension of roll time has increased
Between even more than 30 days, its elasticity The strength can still be controlled in temporary plugging Within the effective range of the agent; Temporary plugging agent Effective time at 180ºC More than 30 days.